Another short update on the recent work of brake coach No.E43172's overhaul
Another door stop patch marked out, ready for replacement |
The 'after' photo following the rotten metal being cut out, new one welded in, welds ground back and the holes for the door stop drilled |
Michael measuring and marking up a corner piece on one of the doors for replacement |
Sizing up the replacement piece |
The replacement piece after having its corner cut, bent in, and welded |
Cleaned up |
Steve cleaning up the door after cutting out the rotten section |
Michael making some adjustments after tack welding the piece in place |
Finishing off welding |
Another small rotten area cut out on one of the top window frames |
Replacement welded in |
Norman undercoating the north end |
The following day, after the first top coat of gloss black had been applied |
No comments:
Post a Comment