Saturday, 27 March 2021

Fence repairs down the line

On Saturday our works train and socially distanced volunteers ventured down the line. This allowed for trimming back of some undergrowth and more importantly repairs to the lineside fencing to take place.


08915 running round the works train at Percy Main


Running the brake van round onto the south end of the train



First job was fence repairs under the Wallsend Road Bridge. After removing the damaged the old post a new hole was dug with the auger, in this photo Michael is using postcrete to install a new post in place


Sections of new wire installed


Adam tightening up tensioners

Venturing north

Michael (L) and Adam (R) digging a new hole for a new fence post

 

No comments:

Post a Comment