Today Austerity No.69's tank and boiler have successfully been lifted.
The next stage will be for the boiler inspector to survey 69's boiler, in the next couple of weeks, to see what work needs doing. Minor work will continue on the rolling chassis outside until there is space available in the workshop.
|
69s tank being lowered onto the flat wagon |
|
The flat wagon is shunted up to the door out the way |
|
The boiler lift begins |
|
The boiler was temporarily placed onto the bed of the hiab lorry, 69's rolling chassis was then hauled out of the way by 08915 |
|
With the chassis shunted out of the way the lorry was able to move up and lift the boiler again before lowering it onto the packing |
|
The boiler being lowered onto packing |
|
Tank on the flat wagon, awaiting a ratchet strap |
|
Boiler successfully on packing |
|
Rolling chassis |
|
The ashpan being lifted out |
|
Michael pressure washing the rear axle and inside of the frames |
|
Work begins on cleaning up the outer firebox |