Thursday, 4 March 2021

Prepping 69 for the boiler lift

Steve (L) and Michael (R) measuring 69's boiler to determine where to place packing

Michael measuring the packing

After the packing was laid out, 69's tank was jacked up slightly so the studs were just out of the bracket

Packing place between the tank and the tank support bracket

69 stabled on the loading spur, ready for tomorrow

 

No comments:

Post a Comment