Monday 15 February 2021

Work on 69

A short update on the work that has taken place on No.69 today.

The cab side sheets have now been removed after a battle between the angle grinders and seized nuts/bolts. Work has now begun loosening off the nuts and bolts on the boiler expansion plates in preparation for the tank and boiler lift in the next few weeks. See image captions for more information.

More updates to follow soon.

LHS cab sheet removed

RHS ready to be removed

LHS cab side sheet

Joined by the RHS

Both removed

Heating boiler expansion plate nuts

Two removed on the RHS, heating up the LHS

Steve underneath removing the nuts

 

No comments:

Post a Comment