In preparation for the bridge inspection and reopening of the railway, volunteers have made a start clearing lineside vegetation from around the Rising Sun overbridge
![]() |
| Antony clearing vegetation from around the north west parapet |
![]() |
| Tom doing the same on the other side |
![]() |
| Adam working underneath the bridge |
![]() |
| Burning the waste in the back field back up at Middle Engine Lane |









No comments:
Post a Comment