In preparation for the bridge inspection and reopening of the railway, volunteers have made a start clearing lineside vegetation from around the Rising Sun overbridge
Antony clearing vegetation from around the north west parapet |
Tom doing the same on the other side |
Adam working underneath the bridge |
Burning the waste in the back field back up at Middle Engine Lane |
No comments:
Post a Comment