Saturday, 27 February 2021

Lineside work at the Rising Sun bridge

In preparation for the bridge inspection and reopening of the railway, volunteers have made a start clearing lineside vegetation from around the Rising Sun overbridge

Antony clearing vegetation from around the north west parapet

Tom doing the same on the other side


Adam working underneath the bridge




Burning the waste in the back field back up at Middle Engine Lane


 

No comments:

Post a Comment