After a short break work has begun to pick up again on the overhaul of our brake coach, No.E43172
![]() |
Wooden steps being removed from the guards doors |
![]() |
Steve grinding off the seized nut and bolt to remove the step on the other side |
![]() |
East side step removed |
![]() |
Michael W begins welding in a new support bracket for the carriage body |
![]() |
First new bracket welded in place |
![]() |
Two of the other intermediate support brackets, which support the body skin stanchions and are rotten, in the process of being cut out |
![]() |
Steve cutting |
![]() |
Brackets cut out and framework ground back, waiting to be built up with weld |
![]() |
Onto the last support bracket as well as half of the step which had rotten on the bottom and bulged up |
![]() |
Half of the step and the support bracket cut out |
![]() |
Ground back |
![]() |
On the north end of the carriage, Michael D begins sanding back body filler |
![]() |
Michael W building up the framework with weld |
![]() |
Metal for the new step being cut to length in the donkey saw |
![]() |
Marking out for more cutting |
![]() |
Steve cutting |
![]() |
New vs old |
No comments:
Post a Comment