| Propelling the coal wagon onto the crossover |
| Buffered up to the other wagons |
| Back down the South end of the yard in the headshunt to pick up the flat wagon |
| The wagon was brought up to the North end of the yard and 08915 was stabled on the end of the loading spur |
| Stabled outside the shed for a coffee break |
| Back to work...dragging the brake van, ACC5 and 401 up the yard |
| And propelled back down onto the other road, 401 coupled up to the flat wagon and ready for tank lifting |
No comments:
Post a Comment