| Richard (R) and Michael (L) setting up rigging equipment |
| Cab free |
| After fettling some more pipework in the cab the loco was shunted forward free of the cab |
| Steve and Michael lowering the cab |
| Temporarily sat on skates whilst the 03 was moved forward slightly in the carriage shop to become clear of the door, then 401 was also shunted forward |
| Back up in the air, Michael propels the cab whilst Steve guides in through on the crane runners into the carriage shop |
| Back down onto the skates |
| Job done |
No comments:
Post a Comment