Valves lifting in presence of the boiler inspector |
With the boiler inspector happy, we commenced the first of 401s running in trials |
Heading down the line |
First time 401 has sat at Percy Main since 2008 |
In Percy Main headshunt, testing out the run round loop |
Heading into the loop |
Approaching Percy Main curve on the way back to Middle Engine Lane |
In between runs, Michael walks round and checks for hot bearings |
Heading back into the yard to do some shunting |
Picking up 08915, tool van, coal wagon and dogfish from the loading spur... |
...and stabling out the way on the crossover |
Back over onto the loading spur/coaling road |
Pulling A5 out the museum |
A5 was stabled out in the yard whilst we headed back into the shed with the flat wagon to pick up some large timbers (used for packing) just so they were out of the workshop/out the way |
Back over to pick up A5 again and stable it in the workshop |
Propelling A5 into the shed |
Headed back to Percy Main after shunting the 08 & wagons out the way again and a quick coffee break |
Michael firing |
View out of Percy Main |
Drivers eye view heading up the line back to Middle Engine Lane |