| The first job of today's big shunt, moving E4 up beside Billy |
| Moving the dogfish and crane over onto the crossover |
| A5 put in the museum |
| Coming into the museum to pick up the 03 after the parcel van and No.1 shunted out of the museum |
| Dragging out 03078 out the Carriage Shop... |
| ...and then propelling it into the running shed |
| Under the extractor fan, starting up |
| Brake Van shunted back into the Carriage & Wagon Shop for its North-end overhaul |
| 03078 idling under the hood and 08915 exiting the museum |
| The view from No.1, being shunted back into the museum |
| Parcel van and RSH No.1 back in the museum |
| Picking up the dogfish and crane from the crossover |
| After stabling the crane back on the hardstand outside the museum, 08915 picks up 401 which was stabled on the back of A5 |
| Michael getting coal with the tractor... |
| ...and coaling up 401 ready for the weekend |
| Stopped for a quick photo of 03078 and 08915 alongside each other whilst giving the 03 a run up and down the yard |
No comments:
Post a Comment