Leaving the shed and heading into the mist on a groggy morning |
Over on the carriages, second man Paul couples up whilst the driver & guard discuss a shunt in order to swap the CL and SLO |
The train was pulled into the platform where the CL was chocked and uncoupled |
The Brake and SLO were pulled back, points changed and then propelled through the loop |
CL stabled at the end of the platform |
Propelling the train through the loop |
Heading up to the top end of the North headshunt where the SLO was stabled |
After leaving the SLO in the headshunt, the Brake was brought back through the loop and back onto the CL |
After stabling the train in Middle Engine Lane platform, 08915 and crew headed down on the morning line inspection, here Paul is testing/inspecting Percy Main groundframe |
Heading back up to Middle Engine Lane after running through the loop and testing Percy Main South points |
No comments:
Post a Comment