Last week, the contents of the 40 foot container were emptied and transported to an off-site storage area in preparation for the removal of the wooden floor and uplift of the container so that works on continuing to lay the track can progress.
The contents of the container boxed up prior to loading into the Luton Van for transport off-site.
With the contents away, the floor could be attacked with a myriad of power tools - which put up a greater fight than what was first expected.
Then, Paul (left) and Tom (right) in the dumper and excavator respectively, transported excavated earth from the platform area to a designated storage area for use on other projects at the railway.
This method worked splendid! Now the area for the station platform and traverser are at the required depth and level. Next job is to complete filling works with ash and ballast to create a solid foundation layer for track and traverser laying and construction.