A small group of volunteers started on laying the ash sub base for the main station area. With the combined effort this task has been ticked off the job list!
Adam operates the vibrating roller to compact the ash sub base down to form a solid level foundational base.
The finished sub surface with the platform path to the left and track bed to the right.
Soon work will start on digging the traverser pit - its outline marked out by the pins and yellow caps.
Numerous sections of track loosely laid alongside some paving flags to denote the position of the track and platform, respectively.