Last week James was busy constructing the foundation for a new wall down the Woodland Walk.

The wall will form part of a display to recreate the scene from the Quayside from years gone by.


 With the trench for the wall foundation dug, James placed reinforcing rebar mesh suspended to provide extra rigidity and support for the wall in the damp conditions of the soil.

James uses the Belle mixer to knock up a concrete mix. Here he is shovelling the mixture into a wheel barrow to be transported to the trench.

The first batch of concrete tipped into the trench, having been levelled and smoothed. Just repeat until the entire foundation is poured.