Saturday, 22 February 2025

Miniature Railway Progress

Matt, Tom and Michael have been persevering with removing the container floor today. Once the floor has been removed, the container can be removed to allow for the construction of the next section of the miniature railway.


Adam and Paul laying track over the recently ballasted station area.


Adam and Thomas packing.




The main station has now been packed and fully levelled.


The second station has received the same attention too, removing some noticeable humps and bringing the track further to the platform edge.

No comments:

Post a Comment