The installation of new wiring in Consett No.10 is closing in on completion. Today Nev, Paul and Neil were testing the cabling which supplies power to the front headlight, rear light and master switch.
With the cab light switched on, it confirms that power is being supplied. On the right, the red light on the master switch glows, indicating that the locomotive is ready to be started.
No comments:
Post a Comment