Wednesday, 22 January 2025

Sentinel 9559 receives primer

Robert has began priming the frame of the Sentinel, as well as sections of the old and new running boards.

Robert applies primer the the support angle and bracket for the front section of the running board on the Driver's side of the locomotive.


The front section completed.


When cleaning up the external side of the front section of frames, Robert discovered some numbering and lettering potentially indicating the size of bolt and/or rivet hole diameters.


In the paint shop, the two existing sections of running board - for both the Driver's and Fireman's side receive a coat of red oxide primer.

No comments:

Post a Comment