Thursday, 16 January 2025

Miniature Railway groundworks continue

Some more groundwork has been carried out today on the main station area with the last of the old terram membrane being removed and separation of the old bark covering saved for use down in the Woodland Walk.



Removal of the last few mounds of bark and top soil.


Marking of the definitive boundary between the Miniature Railway and the picnic area.


A bonus find was several flagstones buried not far below the surface being excavated. These reclaimed flagstones will be incorporated into the new platform at the entrance to the site.


At the end of the day, Tom washes down the bucket of the excavator before parking in storage ready to be used again.

No comments:

Post a Comment