| Another replacement being built for one of the south end crash pillar bottoms |
![]() |
| Rotten section cut out |
![]() |
| Replacement welded in |
![]() |
| Michael has made excellent progress on constructing the carriage's south end corner replacement piece |
![]() |
| The new corner piece beginning to take shape after being partially welded in |
![]() |
| Meanwhile, Steve begins on the replacement piece to the right of the carriage's east side double doors |
![]() |
| Welded in place (minus the bottom) |
![]() |
| The majority of the welds dressed and ready for filler, still some work required around the bottom area |
![]() |
| Steve sizing up a new top door strip piece |
![]() |
| Held in place |
![]() |
| Welding it in |
![]() |
| Michael welding the south corner piece |