Monday, 10 May 2021

No.69 Update

It’s been a while since a proper update on No.69 was posted!

Whilst the time of volunteers has been taken up with other projects on site, no major work has been carried out on No.69 lately. However back in March we had a visit from a very happy boiler inspector who reported that No.69’s boiler is in good condition, with only a few small jobs outstanding.

As time permits our next task is to continue cleaning up the boiler internally as best as possible, as well as removing the regulator valve, before the boiler inspector can come back for a second look.