Monday 12 April 2021

Recent work on the brake coach

Steady progress has continued over the past couple of weeks on the overhaul of our Brake Coach No.E43172

Electrical connection holders and end caps being painted

Photo of the south west corner of the guard's compartment showing a rotten end gusset and rotten crash pillar/frame stanchion

After cutting the rotten section of the crash pillar/stanchion, work started on the gusset whilst there was some extra room

Cutting out the rotten section of the gusset

Rotten sections replaced

Cutting box section down to size to make new gusset bottoms, the next few photos show their backs being cut off, turned around, and welded back on 





One of two complete

Starting the second



Steve cutting out a gusset bottom


Two centre gusset's with replacement bottoms welded in place

Rotten patch on the south end

Replacement metal cut to size

Piece cut out

Replacement put in place

Welded in

Welds dressed and the holes drilled for the lamp bracket

Over on the north end Michael makes a start re-fitting the butterfly valve and other electrical connections

Norman has made excellent painting progress with the second topcoat going on on the east side of the carriage

 

No comments:

Post a Comment