Steady progress has continued over the past couple of weeks on the overhaul of our Brake Coach No.E43172
![]() |
| Electrical connection holders and end caps being painted |
![]() |
| Photo of the south west corner of the guard's compartment showing a rotten end gusset and rotten crash pillar/frame stanchion |
![]() |
| After cutting the rotten section of the crash pillar/stanchion, work started on the gusset whilst there was some extra room |
![]() |
| Cutting out the rotten section of the gusset |
![]() |
| Rotten sections replaced |
![]() |
| Cutting box section down to size to make new gusset bottoms, the next few photos show their backs being cut off, turned around, and welded back on |
![]() |
| One of two complete |
![]() |
| Starting the second |
![]() |
| Steve cutting out a gusset bottom |
![]() |
| Two centre gusset's with replacement bottoms welded in place |
![]() |
| Rotten patch on the south end |
![]() |
| Replacement metal cut to size |
![]() |
| Piece cut out |
![]() |
| Replacement put in place |
![]() |
| Welded in |
![]() |
| Welds dressed and the holes drilled for the lamp bracket |
![]() |
| Over on the north end Michael makes a start re-fitting the butterfly valve and other electrical connections |
![]() |
| Norman has made excellent painting progress with the second topcoat going on on the east side of the carriage |