Friday 9 April 2021

Building up mud-hole doors

Following No.401's cold annual exam a few mud-hole doors were selected for building up with weld and grinding back to tolerance

The doors were held in place in the boiler to mark up where the gaps were before being placed in the vice for welding


After being welded up, the welds were ground back

Bit more tidying up required on this one before its good to go



Work begins on the larger mud-doors



Steve dressing welds


 

No comments:

Post a Comment