Following No.401's cold annual exam a few mud-hole doors were selected for building up with weld and grinding back to tolerance
The doors were held in place in the boiler to mark up where the gaps were before being placed in the vice for welding |
After being welded up, the welds were ground back |
Bit more tidying up required on this one before its good to go |
Work begins on the larger mud-doors |
Steve dressing welds |
No comments:
Post a Comment