Following No.401's cold annual exam a few mud-hole doors were selected for building up with weld and grinding back to tolerance
![]() |
The doors were held in place in the boiler to mark up where the gaps were before being placed in the vice for welding |
![]() |
After being welded up, the welds were ground back |
![]() |
Bit more tidying up required on this one before its good to go |
![]() |
Work begins on the larger mud-doors |
![]() |
Steve dressing welds |