Sunday, 16 February 2020

Work on 401

Continuing boxing up 401 this morning, this door is the rear LHS foundation ring

The door itself, with a new pilotseal joint

Door fitted

Joe cleaning up the studs around the belly plate before re-fitting the belly plate

James fitting another mud-hole door

Michael cleaning up, and slightly filing back, the blowdown valve face

Over on the footplate, Tom is re-fitting the injectors, gauge frames and blanking off the manifold and safety valves

No comments:

Post a Comment