Tuesday 31 December 2019

03079 update

Finishing off 2019 with an update on the metalwork that is being carried out on 03079, Michael is seen here grinding back weld on the one of newly welded in pieces of plate

As well as doing a little more welding on the inside to secure it

Richard welding another small panel in on the upper LHS of the front end

Front sections cut out

And the new pieces being trial fitted before welding. The mesh was temporarily re-fitted to mark out where the two plates needed to be cut down to size

Meanwhile Steve has been busy up top, after cutting the front sections out. Photo showing corroded platework around the chimney base and top of the radiator. The after photo is below


No comments:

Post a Comment