Cameron has been in the workshop today machining some new studs for NCB No.69's boiler.
Although only a temporary measure, lathered generously with COPASLIP, the studs prevent any rust damage to the threads in the boiler backhead whilst the boiler sits outside at Middle Engine Lane.
In the above, Cameron is seen fitting the new studs to the backhead of NCB No.69's boiler.
No comments:
Post a Comment