Saturday, 15 March 2025

Further developments with the Miniature Railway

More sections of 7 1/4" track have been laid within the last week between Engine House Halt and the level crossing - marking the completion of track laying of this section of the Miniature Railway.

The final track panels down on the initial ballast layer ready for joining together.

Looking back towards the level crossing, things have now been levelled and packed.


Looking back towards Engine House Halt. The cleared area behind the sleeper wall of the coal pile was the disposal area for ash, it has been decided to make this space into a small garden area.