Over the past week, Bob has been completing the final drilling of the remaining boiler backhead studs to NCB No.69's boiler.
Setting up the mag drill on a fabricated plate, he is able to drill out the stubborn stud perfectly perpendicular to the backhead plate.
No comments:
Post a Comment