Final completion work to NCB No.69's boiler studs

Over the past week, Bob has been completing the final drilling of the remaining boiler backhead studs to NCB No.69's boiler.


Setting up the mag drill on a fabricated plate, he is able to drill out the stubborn stud perfectly perpendicular to the backhead plate.