| Overview shot of both sets of floorboards |
| Removal of the other side begins |
| Michael starts to remove the bitumen flooring with the windy chisel |
| Steve operating the windy chisel |
| The bitumen is brushed out the side of the carriage and collected in a tub underneath |
| Today's progress. With about half the bitumen removed this allowed Michael and Steve to separate the first of the metal panels underneath and fold it over |
No comments:
Post a Comment