Sunday, 20 December 2020

Work on E43172

Work is progressing well on brake coach No.E43172, whilst most of the recent posts have been on the carriage's guards compartment, this post looks at work taking place elsewhere on the carriage

A rotten piece cut out of the upper north end

Replacement piece tacked in place

Welded in by the trainee

Welds ground flat

Through in the woodshop, Michael D begins sanding down, repairing (where required), and varnishing some of the hardwood floorings out of the guard's compartment

Steve cuts out another piece of metal bodywork for replacement

This photo shows the area that had been cut out and its replacement sitting on the buffer

Michael W welding in the replacement piece

Michael W (L) grinds back his welds after they had cooled, and Steve (R) grinds back his welds on another patch that had been built up with weld

Thomas (L) and Adam (R) trial fitting a replacement door that had been in storage

 

No comments:

Post a Comment