Saturday, 4 July 2020

Work down the line

03078 down at Percy Main with the tool van today for some work to Percy Main groundframe

As well as repairs to the groundframe, Nigel paints the top of the cage with anti-climb paint

Joe doing some strimming

Further up the line at the Tyne Tunnel Trading Estate level crossing, Michael W and Michael D remove the old sign...

...and replace it with a new one

No comments:

Post a Comment