TSO Mk1 being delivered this morning, on loan to us from the North Yorkshire Moors Railway |
Successfully unloaded from the low-loader, our own MK1 SLO was used as a barrier vehicle |
Once the low-loader was clear the TSO was shunted further down the coal road, allowing for the SLO to be shunted back onto the flat road |
The TSO could then be picked up again and shunted over the pit for a Fitness to Run exam |
In the running shed over the pit for inspection |
No comments:
Post a Comment