Wednesday 27 November 2019

TSO MK1 Delivery

TSO Mk1 being delivered this morning, on loan to us from the North Yorkshire Moors Railway

Successfully unloaded from the low-loader, our own MK1 SLO was used as a barrier vehicle


Once the low-loader was clear the TSO was shunted further down the coal road, allowing for the SLO to be shunted back onto the flat road

The TSO could then be picked up again and shunted over the pit for a Fitness to Run exam

In the running shed over the pit for inspection


No comments:

Post a Comment