Thursday, 6 March 2025

New temporary boiler studs for NCB No.69's boiler

Cameron has been in the workshop today machining some new studs for NCB No.69's boiler.

Although only a temporary measure, lathered generously with COPASLIP, the studs prevent any rust damage to the threads in the boiler backhead whilst the boiler sits outside at Middle Engine Lane.


In the above, Cameron is seen fitting the new studs to the backhead of NCB No.69's boiler.

Wednesday, 5 March 2025

Final cosmetic work to the Association's tank wagon

Michael has been in the running shed using the electric polisher on the lettering of the 'SHELL' and 'BP to remove slight marks left from signwriting.



The wagon will be pulled out of the workshop in the near future to take its place in our tank wagon set and our demonstration freight trains.

Tuesday, 4 March 2025

NCB No.69 rear buffer beam angles painting

Previously painted red, it was noticed by one of the volunteers that the rear buffer beam bunker support angles were painted black whilst NCB No.69 was at South Hetton Colliery with the NCB.

 

As seen above on the morning of Friday 13th April 1973 outside the repair shop near South Hetton Colliery. Source, Sassaby, Flickr.

Therefore, Cameron has rectified this by painting the support angles (previously red) black. 

Having already applied one coat of black over the previous red, he etches the surface to provide a key for the second coat.

Monday, 3 March 2025

Final completion work to NCB No.69's boiler studs

Over the past week, Bob has been completing the final drilling of the remaining boiler backhead studs to NCB No.69's boiler.


Setting up the mag drill on a fabricated plate, he is able to drill out the stubborn stud perfectly perpendicular to the backhead plate.

Sunday, 2 March 2025

New colour for NCB No.69's rear bufferbeam

Last weekend, Cameron applied the first coat of 'Tomato Red' - RAL 3013 to the rear buffer beam of NCB No.69.

Before...

...During...

And after - with the buffer housings left on the old red to be repainted at a later date.

Although the colour difference is subtle, it was concluded that Tomato Red is a closer match to the assumed original swatch left on the front buffer beam.

Saturday, 1 March 2025

More Half Term Running


Robert building up his fire in the morning.


401 receiving attention to one of its spring hangar pins before heading out into service.


Today's Guard, Tristan, and trainee, Chad.


Chad guiding 401 onto the carriages.

Boxford lathe electrical inspection

Since last weeks delivery of the new Boxford Model A lathe, Alan has been completing a bit of electrical work to ensure that the lathe can work efficiently and safely.


Having inspected the motor, switches and other electrical components, a bit of attention is required to the earthing cable. In the coming weeks, it will be fully operational.
Watch this space for new items fabricated using this machine!