Sunday, 17 March 2024

Prepping and Painting on No.69

The clean up, preparation and priming of more locomotive frame components has been the focus of several volunteers this week. A handful of the group working on 69 have been needle gunning, wire wheeling and priming the driver's side running board angle. As well as this, the ever so important technique required for painting a locomotive has been taught to volunteers with the driver's side front wheel getting its first coat of primer.


Jack needle gunning what is the inside faces of the angle to remove any loose - and hard to remove - rust.


The second stage of metal prep - Jack begins to wire wheel the internal faces with an angle grinder and wire wheel cup attachment.


Aadil and Adam carry on the needle gunning process along the length of the angle, while Jack follows behind wire wheeling.


A close-up shows minimal rust is left over.


Now moved inside the workshop, the angle was placed on trestles to then be primed. Davey came to inspect the lads' handy work - safe to say he was somewhat impressed.


Aadil begins priming the two internal faces of the angle.


A recently primed angle.


Aadil applies the second coat of red oxide primer. The other external faces will be prepped at a later date.


The front wheel set receives some attention with Aadil beginning to apply the first coat of primer.


Cameron takes over the brush to touch up some areas whilst Aadil is required elsewhere in the workshop.


A finished front wheel.


A look at the internal side.

Monday, 11 March 2024

Today's Woodland Walk Progress

 Photos from today's work by Michael W, Michael D, James and Cameron to lay the foundations for the education lodge and construct the first butterfly mound in stage two of the Woodland Walk.


The land on which the education lodge will stand is marked out ready to be excavated.


Michael W changing the bucket on the mini digger...


...and begins digging.


Loading up the dumper...


...which Michael D delivers to James and Cameron...


...to build the first butterfly mound.





Ready for the membrane...


...which James lays out.


Michael W loading the dumper with material...


...to go on top of the membrane.

Sunday, 10 March 2024

Needlegunning

 

Davey has been busy needlegunning the frames of the conflat wagon.


Priming of the frames is nearing completion. 

Saturday, 9 March 2024

This Week's Work on No.69

The driver's side buffer has been wire wheeled and is ready to be primed with red oxide. Similarly, the two front buffer housings have received a coat of red oxide on their main body. Elsewhere, the internal face of the rear buffer beam has been fully primed with areas of severe pitting scheduled to be welded. Finally, some attention has been paid to the driving wheel set, with primer having been applied to the driver's side wheel. The fireman's side is yet to be wire wheeled, then primed in the coming weeks.


Driver's side front buffer shortly after wire wheeling.


Another view to show the rear face.


Front buffer housings now primed. Awaiting to be placed in storage until fitting back in the locomotive.


Inside view looking at the rear buffer beam, the extent of pitting can be seen, with unpainted areas to be welded. The steam brake cylinder still attached to the frames on the left.


Cameron applying the first coat of red oxide to the front wheel set.

A5 Clean-Up

Aadil has been busy cleaning up A5 ready for the re-opening of the museum...



'Quartering' the buffers...

Thursday, 7 March 2024

New Roller Banner

Cameron has produced a roller banner to promote the restoration of NCB No.69...

Saturday, 2 March 2024

More Work to No.69's Buffers

Staying with the buffer theme. Some younger volunteers have been lending a hand with some of the restoration tasks, including removing rust and debris from the removed buffer housings, as well as removing nuts and bolts from the front buffer beam. Meanwhile, work is still focused on the rear of the locomotive with the frames continuing to be primed ready for the fitting of the cab floor.


Jack wire wheeling surface rust from one of the buffer housings.


Back face of the buffer housings prior to receiving the first coat of red oxide primer.


The two buffer housings from the front of the locomotive shortly after priming.


Driver's side front buffer soon to be wire wheeled.


Joss giving it his all to loosen a bolt in the front buffer beam.


Rear internal angle plate freshly primed after hours of needle gunning to remove stubborn rust.