With the nice weather in the North East of England becoming ever more present, Bob has taken the opportunity to complete some preparatory work on NCB No.69's boiler.
He has manufactured 12 soaking pots for some red diesel to loosen the stubborn studs that hold the safety valves (above) and manifold (below) onto their respective flanges on the crown of the boiler.
All we have to do now is wait and see if the red diesel has worked it's magic!
No comments:
Post a Comment