Cameron has been continuing his work on painting the inside of the frames of NCB No.69, with the aim to get one coat of red paint applied before Christmas, today he has been painting one of the frame bracing angles and around the hornguides.
Cameron painting around one of six hornguides.
The angle bracing in question that requires painting.
Robert spent the entire afternoon applying a final coat of red oxide paint to NCB No.69's boiler before being stored in the yard for the winter period.
No comments:
Post a Comment