Volunteer Bob has been trying tirelessly to remove the old boiler studs from NCB No.69's backhead for over a month. With varying success in utilising different removal methods, he has so far managed to remover around 75%.
In readiness for the fitting of the new studs, Cameron and Aaran have been re tapping the holes and cleaning the threads.
Robert has also been removing studs from NCB No.69's tank, these studs were seized in the frames and hold the feed water pipes from the tank to the injectors.
No comments:
Post a Comment