Cameron has been producing some nuts for the reproduced bolts for the rear buffer beam. Elsewhere, Robert has painted both front buffer housings the first coat of red and are awaiting to be stored until fitting back on No.69. Also, George, Alan and Simon have been trial fitting the overhauled brake hangers to see if the new bushes are within tolerance.
Facing the hex bar stock.
Centre drilling for the 3/4" twist drill hole.
Long strands of swarf are produced drilling to an approximate depth of 2".
Drilled hole ready for tapping.
Tapping the 9 TPI thread for 7/8" BSW nut.