Some of the track purchased for the miniature railway project is in need of re-sleepering, so this week Tom and Adam have turned their attention to one of two sets of points in dire need of timber replacement.
Using timber and screws kindly donated by another NTSRA volunteer, they have brought the point back into good condition. It's now ready to take its place as part of the run round loop at the north terminus of the line.
No comments:
Post a Comment