Sunday, 21 July 2024

More on No.69

Cameron has stencilled a sign onto a section of No.69's boiler to inform the public about which locomotive the boiler belongs to.



The completed sign on the front section of No.69's boiler.


Alan and Tom having set up one of the brake hangers on the milling machine begin boring the existing bush to remove it.


What's left of one of the bushes removed from one end of the brake hanger.


The right hand driving brake hanger with one bush removed.


Cameron has also designed some NCB No.69 pin badges, which will be available to purchase at next weekend's model railway exhibition, and in the guards' van shop after that.

No comments:

Post a Comment