Friday, 18 June 2021

Point levers

With four engines in service over our Gala weekend two extra point levers were required for use at Percy Main. The levers we use at Percy Main have extensions attached at the end so that they can be used as and when required and kept on the locos

After measuring and cutting the new metal, the first one is ready for tack welding



First one done


Onto the second

Both complete, awaiting trial fitting then painting

 

No comments:

Post a Comment