With four engines in service over our Gala weekend two extra point levers were required for use at Percy Main. The levers we use at Percy Main have extensions attached at the end so that they can be used as and when required and kept on the locos
After measuring and cutting the new metal, the first one is ready for tack welding |
First one done |
Onto the second |
Both complete, awaiting trial fitting then painting |
No comments:
Post a Comment