Following a short break over New Years volunteers were back in the workshop from the 2nd Jan to carry on working on the brake coach
Another rotten section cleaned up ready for cutting on one of the east side doors |
Measuring and marking replacement metal for cutting to size |
Patch welded in |
Ground flat, ready for filler |
Adam (L) and Thomas (R) removing the centre wall from the guards comparment |
Michael sizing up replacement metal for the metal step on the guards compartment's west side double doors |
Clamped in position and ready for welding |
Welded in |
Thomas painting the north end interior wall with bitumen |
Adam working on removing the vacuum pipe |
Heating up a seized nut |
Robert working on removing a cut down pipe from inside a valve which was removed from the vacuum system |
Jean varnishing wood pieces from the interior of the carriage, including window and door framework |
Steve starts his next patch |
New metal cleaned up and ready to go. Thankfully we have about half a dozen of these templates to fit around the window tops and bottoms in storage |
Rotten section marked out for cutting |
Cut out |
New piece in place ready for welding |
Tacked in place |
Welded in |
Ground back and ready for filler |
No comments:
Post a Comment