Following a short break over New Years volunteers were back in the workshop from the 2nd Jan to carry on working on the brake coach
![]() |
| Another rotten section cleaned up ready for cutting on one of the east side doors |
![]() |
| Measuring and marking replacement metal for cutting to size |
![]() |
| Patch welded in |
![]() |
| Ground flat, ready for filler |
![]() |
| Adam (L) and Thomas (R) removing the centre wall from the guards comparment |
![]() |
| Michael sizing up replacement metal for the metal step on the guards compartment's west side double doors |
![]() |
| Clamped in position and ready for welding |
![]() |
| Welded in |
![]() |
| Thomas painting the north end interior wall with bitumen |
![]() |
| Adam working on removing the vacuum pipe |
![]() |
| Heating up a seized nut |
![]() |
| Robert working on removing a cut down pipe from inside a valve which was removed from the vacuum system |
![]() |
| Jean varnishing wood pieces from the interior of the carriage, including window and door framework |
![]() |
| Steve starts his next patch |
![]() |
| New metal cleaned up and ready to go. Thankfully we have about half a dozen of these templates to fit around the window tops and bottoms in storage |
![]() |
| Rotten section marked out for cutting |
![]() |
| Cut out |
![]() |
| New piece in place ready for welding |
![]() |
| Tacked in place |
![]() |
| Welded in |
![]() |
| Ground back and ready for filler |