Tuesday 5 January 2021

Recent work on the brake coach

Following a short break over New Years volunteers were back in the workshop from the 2nd Jan to carry on working on the brake coach

Another rotten section cleaned up ready for cutting on one of the east side doors

Measuring and marking replacement metal for cutting to size

Patch welded in

Ground flat, ready for filler

Adam (L) and Thomas (R) removing the centre wall from the guards comparment

Michael sizing up replacement metal for the metal step on the guards compartment's west side double doors

Clamped in position and ready for welding

Welded in

Thomas painting the north end interior wall with bitumen

Adam working on removing the vacuum pipe

Heating up a seized nut

Robert working on removing a cut down pipe from inside a valve which was removed from the vacuum system

Jean varnishing wood pieces from the interior of the carriage, including window and door framework

Steve starts his next patch

New metal cleaned up and ready to go. Thankfully we have about half a dozen of these templates to fit around the window tops and bottoms in storage

Rotten section marked out for cutting

Cut out

New piece in place ready for welding

Tacked in place

Welded in

Ground back and ready for filler

 

No comments:

Post a Comment