Ground frame work

08915 (still disguised as 08802) at Percy Main with the tool van to allow volunteers to carry out maintenance on Percy Main ground frame

Richard begins disconnecting the point rodding from the frame

The Michaels begin dismantling the other end

Steve begins removing the bolts from the wooden block whilst Michael and Richard carry on dismantling the points linkages 

Once all is out and the wood is removed, Carl begins digging the hole

Richard digging

Half barrel placed in the ground and cemented with the points linkage in place and rod re-connected to the frame. The points will remain disconnected until the cement has fully cured