Saturday, 23 February 2019

Morning prep & line inspection

Topping up 08915s sump

Starting up

Stabling the brake van in the run round loop at Middle Engine Lane before heading down the line on the morning inspection

Heading down to Percy Main, approaching the Rising Sun Bridge

Stopped just South of the Coast Road Bridge so the crew could carry out some fence repairs

Departing Percy Main to head back to Middle Engine Lane, Second Mans view

After arrival back at Middle Engine Lane the dogfish and coal wagons were picked up and stabled on the South end of the brake van

Propelling into the platform ready for the Branch Line Society group

No comments:

Post a Comment