| Last job of today, 08915 shunting in order to swap D2078 and the Brake Van around |
| To begin with, the Gresley coach and crane were shunted out the way of the museum entrance |
| Picking up the Parcel Van and No.1 |
| After dragging the stock out of the museum D2078 was picked up and dragged out the workshop |
| 08915 propelling the stock |
| D2078 stabled outside whilst the carriage shop is cleared |
| D2078 stabled in the Carriage & Wagon workshop to finish its repaint |
| And the brake van in the running shed ready for van rides at Half Term. After Half Term the van will go back into the C&W workshop to overhaul the North end |
No comments:
Post a Comment