Saturday, 26 January 2019

Peckett Cosmetic Work

Joe has been carrying on with the cosmetic work to Ashington No.5 today, seen here working on grinding the paint off the cylinder drains handle

Damper handles



Ejector valve polished

And the blower valve done today too (far left valve)

No comments:

Post a Comment