With the museum closed and Ashington No.5 disposed of the lads set to work on cleaning and clearing areas in preparation for Ale by Rail
![]() |
Michael and Joe cleaning the apron |
![]() |
Trial assembly of the beer garden! |
![]() |
Barrels and cable drum as tables temporarily in place |
![]() |
Work begins on clearing the museum on some of it's smaller exhibits |
![]() |
No.1 moved back to allow space for the stage being built tomorrow |
![]() |
E4 being shunted out the museum |
No comments:
Post a Comment