With the museum closed and Ashington No.5 disposed of the lads set to work on cleaning and clearing areas in preparation for Ale by Rail
![]() |
| Michael and Joe cleaning the apron |
![]() |
| Trial assembly of the beer garden! |
![]() |
| Barrels and cable drum as tables temporarily in place |
![]() |
| Work begins on clearing the museum on some of it's smaller exhibits |
![]() |
| No.1 moved back to allow space for the stage being built tomorrow |
![]() |
| E4 being shunted out the museum |







No comments:
Post a Comment