| The new waggon arriving at the museum |
| 08915 shunting the Gresley Pigeon Van out the way of the loading spur |
| 62ft Well Waggon on loan from the NRM Shildon, ready to be unloaded |
| D2078, using the Tool Van as a barrier waggon, buffers up to the Well Waggon |
| Unloading begins |
| Successfully unloaded |
| 08915 posing in the South head shunt with the Well wagon and Salmon wagon |
No comments:
Post a Comment