Saturday, 26 May 2018

Engine re-building

Throughout the day volunteers have been continuing to progress with 401. Today they had the frame jacked up to enable the springs to be fitted and lower the axleboxes into the underkeeps, which allows the springs to be fitted under no tension. The weight of the frames is then slowly lowered down onto the springs. The rear side rods have also been fitted along with the combination lever, radius rod and union link (on both sides)





Keith, George and Robin fitting the RHS centre spring



No comments:

Post a Comment