Part of the Ashington No.5's Winter Maintenance this year was to fit a new injector overflow pipe on the fireman's side as the old one had numerous holes
Ashington No.5's new overflow pipe, seen here now in place ready for the fitting of the elbow piece
George fitting the clips underneath that hold the pipe to the bottom of the running board
No comments:
Post a Comment